Our Process

Your Dream Pool, Step by Step

Experience Envy Pools’ proven construction process refined over 20 years of combined experience. As a licensed, bonded, and insured contractor (ROC #332157 KA-5), we guide you through every phase—from initial consultation to final splash—ensuring exceptional results and complete peace of mind.

Step 1

Initial Consultation

On-Site Visit

Our design experts visit your property to assess space, discuss your vision, and understand your lifestyle needs. We evaluate site conditions, utility locations, access points, and any unique challenges or opportunities your Arizona landscape presents.

Needs Assessment

  • Pool usage patterns and entertaining preferences

  • Budget parameters and financing options

  • Timeline requirements and seasonal considerations

  • Integration with existing landscaping and hardscaping

  • Future outdoor living additions and expansions

Step 2

Custom 3D Design

Professional Design Development

Our in-house design team creates detailed 3D renderings that bring your vision to life before construction begins. Our designs take into account aspects of your project such as pool layout, material selections, lighting plans, and landscape integration.

Design Includes

  • Detailed pool dimensions, depths, and features

  • Material specifications and color selections

  • Equipment placement and circulation layouts

  • Landscaping and hardscaping recommendations

  • Lighting design for safety and ambiance

Design Revisions

We refine your design based on your feedback, ensuring every detail meets your expectations before moving forward with construction.

Detailed renderings, specifications, and design documents are provided as part of a paid design agreement or signed construction contract.

Step 3

Planning & Permits

Engineering & Structural Analysis

Our team handles all technical requirements including structural engineering, hydraulic calculations, and safety compliance to ensure your pool meets all Arizona building codes.

Permit Management

  • Building permit applications and approvals

  • Supplying documents for HOA submissions and architectural reviews

  • Utility coordination for gas, electrical, and water

  • Inspection scheduling throughout construction

  • Code compliance verification at each phase

Step 4

Pre-Construction

Site Preparation

  • Utility location and marking services

  • Access route planning for equipment and materials

  • Property protection measures for existing landscaping

  • Design layout to confirm placement of all the features

Project Kickoff

We schedule a pre-construction meeting to review timelines, introduce your project manager, and address any final questions before breaking ground.

Step 5

Excavation & Structural

Precision Excavation

We excavate your pool to exact specifications while protecting existing utilities and landscaping. Soil conditions are evaluated and addressed as needed.

Steel & Plumbing Installation

  • Rebar placement for structural integrity

  • Plumbing rough-in for circulation systems

  • Electrical conduit installation for lighting and equipment

  • Gas lines for heaters and fire features

  • Equipment pad preparation and placement

Step 6

Shotcrete Application

Structural Shell Construction

High-pressure shotcrete application creates your pool’s permanent structure. Our certified technicians ensure proper thickness, density, and structural integrity throughout the shell.

Curing Process

The shotcrete shell undergoes proper curing with regular water application and monitoring to achieve maximum strength and durability.

Step 7

Tile & Coping Installation

Premium Material Installation

  • Waterline tile installation with precision spacing

  • Coping placement with proper drainage slopes

  • Stone or concrete deck preparation

  • Feature wall construction for waterfalls or fire elements

Quality Control

Each installation phase includes detailed quality inspections to ensure proper alignment, spacing, and adhesion.

Step 8

Equipment & Plumbing

System Installation

  • Pump, filter, and heater installation

  • Automated control system programming

  • Safety equipment installation and testing

  • Water feature plumbing and electrical connections

  • Final equipment commissioning and startup

Step 9

Interior Finish

Mini Pebble Application

Your chosen interior finish is applied by certified technicians, creating the final water-holding surface. Options include standard premium pebble finishes.

Finish Curing

Proper curing techniques ensure your finish achieves optimal durability, appearance, and longevity.

Step 10

Decking & Landscaping

Hardscape Completion

  • Final deck installation with proper drainage

  • Stain and seal application for concrete surfaces

  • Stone or paver installation with joint stabilization

  • Final grading and drainage verification

Landscape Integration

Coordination with landscape professionals for plant installation, irrigation systems, and final site cleanup.

Step 11

Startup & Training

Pool Commissioning

  • Initial water fill and chemical balancing

  • Equipment startup and system testing

  • Leak detection and pressure testing

  • Final safety inspections and approvals

Homeowner Training

Comprehensive orientation covering equipment operation, maintenance schedules, chemical balancing, and safety procedures. We provide detailed manuals and ongoing support contacts.

Step 12

Final Inspection & Handover

Quality Assurance

  • Complete system functionality testing

  • Final walkthrough with project manager

  • Warranty documentation and service schedules

  • Emergency contact information and service protocols

Welcome to Pool Ownership

Your pool is ready for enjoyment! We hope you will invite us to the pool party!

Typical Construction Timeline

  • Design, permits, and engineering: 6-8 weeks

  • Construction phase: 16-20 weeks (Depending on Scope) for an Average Pool

  • Weather and site conditions may affect schedule

  • Regular progress updates throughout construction

Project Communication

  • Dedicated project manager for your build

  • Regular progress reports

  • Direct communication channels for questions

  • Proactive updates on schedule changes